top of page
Drone image of F1 Pier

FEATURE PROJECT:
F1 DOCK CONDITION ASSESSMENT

SERVICES:

Engineering Assessment

​

Amorient was appointed by Tristar Terminals Guam Inc. to conduct a substructure inspection and to provide recommendations for rehabilitation, repair or replacement of the damaged substructure elements.

​

The inspections included the main platform, four breasting dolphins and two mooring dolphins. The underwater inspections were performed by Hawaii based firm, Sea Engineering Inc.

643 Chalan San Antonio, Suite 114 | Tamuning | GUAM 96913

+1 (671) 472-3301

Amorient Engineering © 2025

GBM Best Companies to Work For.jpg
bottom of page